Location
|
|||
---|---|---|---|
Site name and plot numbers: | Complex 1-5 | ||
Town / Commune: | Białobrzegi | ||
Address (street, house number): | Rzemieślnicza | ||
District: | białobrzeski | ||
Province (Voivodship): | mazowieckie | ||
The plot is a part of Special Economic Zone: | done | ||
Special Economic Zone: | Tarnobrzeg "Euro-Park" | ||
Website: | https://www.google.com/maps/@51.6444591,20.9349237,513m/data=!3m1!1e3!4m2!10m1!1e2 | ||
Area of property
|
|||
Max. available area (as one piece) [ha]: | 4.3 ha | ||
The shape of the site: | Other | ||
Possibility for expansion (short description): | Yes | ||
Property information
|
|||
Approx. land price [PLN/m²] including 23% VAT: | 125 PLN/m² | ||
Owner(s) | Owner | Białobrzegi Commune | |
Owner's area [ha] | 6.86 ha | ||
Main owner type | Commune | ||
Valid zoning plan: | done | ||
Zoning | Zoning | Production buildings, warehouses | |
Forms of support at the local level: | done | ||
Terms of acquisition | Sale | done | |
Lease | not_interested | ||
Perpetual usufruct | not_interested | ||
Land specification
|
|||
Soil class | Soil class | other | |
Area [ha] | 6.86 ha | ||
Present usage | Present usage | industrial | |
Differences in land level [m]: | Flat land | ||
Building height limit [m]: | 15 m | ||
Building coverage [%]: | 80 | ||
Soil and underground water pollution: | not_interested | ||
Underground water level [m]: | 3 | ||
Were geological research done: | not_interested | ||
Risk of flooding or land slide: | not_interested | ||
Underground obstacles: | not_interested | ||
Ground and overhead obstacles: | done Electic line 15KV | ||
Ecological restrictions: | done Protected Landscape Area, Dolina Pilki and Drzewiczki River | ||
Buildings / other constructions on site: | not_interested | ||
Transport links
|
|||
Access road to the plot (type and width of access road) | Road width [m] | 10 m | |
Road type | national road | ||
Nearest motorway / express road / national road | S7: 2 km | ||
Sea and river ports located up to 200 km | Gdańsk: 414 km | ||
Railway line | Dobieszyn: 20 km | ||
Railway siding | Dobieszyn: 20 km | ||
Nearest international airport | Warszawa: 70 km | ||
Nearest province capital | Warszawa: 70 km | ||
Existing infrastructure
|
|||
Electricity | done | Connection point (distance from boundary) [m] | 100 m |
Voltage [kV] | 15 kV | ||
Gas | done | Connection point (distance from boundary) [m] | 100 m |
Calorific value [MJ/Nm³] | 31 MJ/Nm³ | ||
Pipe diameter [mm] | 32 mm | ||
Water for social purposes | done | Connection point (distance from boundary) [m] | 100 m |
Available capacity [m³/24h] | 500 | ||
Water | done | Connection point (distance from boundary) [m] | 100 m |
Available capacity [m³/24h] | 500 | ||
Sewage discharge | done | Connection point (distance from boundary) [m] | 100 m |
Available capacity [m³/24h] | 700 | ||
Treatment plant | done | ||
Telephone | done | Connection point (distance from boundary) [m] | 500 m |
Offer prepared by
|
|||
Name, surname: | UM Białobrzegi - paih@bialobrzegi.pl | ||
Position: | Mieczysław Danielewicz - Zastępca Burmistrza Miasta I Gminy | ||
Phone: | 48 3863010 | ||
Mobile: | 781167328 | ||
e-mail: | paih@bialobrzegi.pl | ||
Contact person
|
|||
Name, surname: | Mieczysław Danielewicz | ||
Phone: | 48 3863013 | ||
Mobile: | 781167328 | ||
e-mail: | m.danielewicz@bialobrzegi.pl | ||
Created by (user account type)
|
Commune |
Time since last edit: 1 month 26 days
Last modified: 2022-12-06