PAIH - Offer details 16-144

Greenfield

Infrastructure:

Electricity
Water
Sewage
Gas
Location
Site name and plot numbers: Warmątowice
Town / Commune: Strzelce Opolskie
Address (street, house number): Warmątowice
District: strzelecki
Province (Voivodship): opolskie
Site belongs to Special Economic Zone: done
Special Economic Zone: Katowice
Website or link to My Maps: https://drive.google.com/open?id=1_p8cQRoc0by_egqBq_XQ8A3-uGUSwcox&usp=sharing
Area of property
Max. available area (as one piece) [ha]: 210 ha
The shape of the site: Other
Possibility for expansion (short description): Yes, up to 400 ha
Property information
Approx. land price [PLN/m²] including 23% VAT: 50 PLN/m²
Owner(s) Owner State Treasury - KOWR
Owner's area [ha] 210 ha
Main owner type KOWR
Valid zoning plan: done
Link to the resolution: http://bip.strzelceopolskie.pl/main/dokumenty/3675.html
Zoning Zoning Production buildings, warehouses
Forms of support at the local level: done
Terms of acquisition Sale done
Land specification
Present usage Present usage agricultural
Soil class Soil class IIIa
Area [ha] 18.08 ha
Soil class IVa
Area [ha] 15.05 ha
Soil class IVb
Area [ha] 64.1601 ha
Soil class V
Area [ha] 133.5999 ha
Soil class VI
Area [ha] 16 ha
Differences in land level [m]: 10 m
Building height limit [m]: Additional technical buildings can be high : 40 m
Building coverage [%]: 80
Soil and underground water pollution: not_interested
Underground water level [m]: 10 m
Were geological research done: done
Risk of flooding or land slide: not_interested
Underground obstacles: not_interested
Ground and overhead obstacles: not_interested
Ecological restrictions: not_interested
Buildings / other constructions on site: not_interested
Transport links
Access road to the plot (type and width of access road) Road width [m] 7 m
Road type national road
Road width [m] 7 m
Road type national road
Nearest motorway / express road / national road A4: 4 km
Sea and river ports located up to 200 km Koźle River Port: 20 km
Railway line Strzelce Opolskie: 2 km
Railway siding Strzelce Opolskie: 1 km
technical possibility build new railway siding: 0 km
Nearest international airport Katowice: 60 km
Nearest province capital Opole: 35 km
Existing infrastructure
Electricity done Connection point (distance from boundary) [m] 0 m
Voltage [kV] 15 kV
Available capacity [MW] 2-3 MW; Main Supply Point for more than 80 MW in Ujazd, Kędzierzyn-Koźle
Gas done Connection point (distance from boundary) [m] 200 m
Calorific value [MJ/Nm³] 9.97 MJ/Nm³
Pipe diameter [mm] 500 mm
Available capacity [Nm³/h] no limit
Water for social purposes done Connection point (distance from boundary) [m] 0 m
Available capacity [m³/24h] 2400
Water done Connection point (distance from boundary) [m] 3500 m
Available capacity [m³/24h] Industial water (mine water)
Sewage discharge done Connection point (distance from boundary) [m] 400 m
Available capacity [m³/24h] 30
Treatment plant done
Telephone done Connection point (distance from boundary) [m] 0 m
Offer prepared by
Name, surname: Piotr Regeńczuk - Opolskie COI
Position: Główny Specjalista
Phone: (77) 403 36 48
Mobile: +48 533 314 428
e-mail: invest@ocrg.opolskie.pl
Contact person
Name, surname: Piotr Regeńczuk
Phone: +48 4033648
Mobile: +48533314428
e-mail: invest@ocrg.opolskie.pl
Created by (user account type)
Regional

Time since last edit: 5 months 3 days

Last modified: 2019-10-25


assessment Statistics   note Brochure  
print Download check list   Get Kml   {{comparing?'star':'star_border'}} Compare