PAIH - Offer details 32-341

Greenfield

Location
Site name and plot numbers: Complex of plots in High Technologies Industrial Park in Stargard consisting of plots: 96/124 and 96/128.
Town / Commune: Stargard
Address (street, house number): Metalowa
District: stargardzki
Province (Voivodship): zachodniopomorskie
The plot is a part of Special Economic Zone: done
Special Economic Zone: Kostrzyn-Słubice
Website: https://htip.stargard.pl/
Area of property
Max. available area (as one piece) [ha]: 2.1 ha
The shape of the site: Rectangle
Possibility for expansion (short description): Yes. It is possible to expand this area up to 5.5 ha. (Owned by The Municipality of Stargard.)
Property information
Approx. land price [PLN/m²] including 23% VAT: 65 PLN/m²: Approximate land price net: 52-53 PLN/m2
Owner(s) Owner The Municipality of Stargard
Owner's area [ha] 2.1 ha
Main owner type Commune
Valid zoning plan: not_interested
Zoning Zoning Production buildings, warehouses
Forms of support at the local level: done
Terms of acquisition Sale done
Lease not_interested
Perpetual usufruct not_interested
Land specification
Present usage Present usage other
Soil class Soil class other
Area [ha] 2.1 ha
Differences in land level [m]: The maximum difference in land level doesn't exceed 1 m.
Building height limit [m]: 35 m
Building coverage [%]: 85
Soil and underground water pollution: not_interested
Underground water level [m]: 5-8
Were geological research done: done
Risk of flooding or land slide: not_interested
Underground obstacles: not_interested
Ground and overhead obstacles: not_interested
Ecological restrictions: not_interested
Buildings / other constructions on site: not_interested
Transport links
Access road to the plot (type and width of access road) Road type communal asphalt road
Road width [m] 7 m
Nearest motorway / express road / national road Express road S10: 5 km
Highway A6: 28 km
Express road S3: 30 km
Sea and river ports located up to 200 km Szczecin sea port: 40 km
Świnoujście sea port: 124 km
Railway line Railway line is located in High Technologies Industrial Park in Stargard: 1.8 km
Railway siding Railway line is located in High Technologies Industrial Park in Stargard: 1.8 km
Nearest international airport Szczecin - Goleniów im. NSZZ Solidarność: 50 km
Poznań-Ławica im. Henryka Wieniawskiego: 193 km
Berlin-Schönefeld Airport: 199 km
Nearest province capital Szczecin: 40 km
Existing infrastructure
Electricity done Connection point (distance from boundary) [m] 0 m
Voltage [kV] 110 kV
Gas done Connection point (distance from boundary) [m] 0 m
Calorific value [MJ/Nm³] 38 MJ/Nm³
Pipe diameter [mm] 315 mm
Water for social purposes done Connection point (distance from boundary) [m] 0 m
Available capacity [m³/24h] 11500
Water done Connection point (distance from boundary) [m] 0 m
Available capacity [m³/24h] 11500
Sewage discharge done Connection point (distance from boundary) [m] 0 m
Available capacity [m³/24h] 11500
Treatment plant done
Telephone done Connection point (distance from boundary) [m] 0 m
Offer prepared by
Name, surname: Katarzyna Wilk
Position: Inspektor ds. obsługi inwestora w Biurze Funduszy Europejskich i Rozwoju Gospodarczego
Phone: +48 91 814 39 16
e-mail: investments@um.stargard.pl
Languages: Polish, English
Contact person
Name, surname: Arkadiusz Kocikowski
Phone: +48 601 725 868
e-mail: a.kocikowski@um.stargard.pl
Name, surname: Katarzyna Wilk
Phone: +48 91 814 39 16
e-mail: k.wilk@um.stargard.pl
Created by (user account type)
Commune

Time since last edit: 5 months 26 days

Last modified: 2022-09-28


assessment Statistics   note Brochure  
print Download check list   Get Kml   {{comparing?'star':'star_border'}} Compare