Location
|
|||
---|---|---|---|
Site name and plot numbers: | Plot no 273/18 | ||
Town / Commune: | Szczecinek | ||
Address (street, house number): | Turowo | ||
District: | szczecinecki | ||
Province (Voivodship): | zachodniopomorskie | ||
The plot is a part of Special Economic Zone: | done | ||
Special Economic Zone: | Słupsk | ||
Website: | investparkszczecinek.pl | ||
Area of property
|
|||
Max. available area (as one piece) [ha]: | 2.94 ha | ||
The shape of the site: | Triangle | ||
Possibility for expansion (short description): | yes | ||
Property information
|
|||
Approx. land price [PLN/m²] including 23% VAT: | 70 PLN/m² | ||
Owner(s) | Owner | Invest Park Szczecinek Sp. z o.o. | |
Main owner type | Commune | ||
Valid zoning plan: | done | ||
Zoning | Zoning | Production buildings, warehouses | |
Forms of support at the local level: | not_interested | ||
Terms of acquisition | Sale | done | |
Lease | done | ||
Land specification
|
|||
Soil class | Soil class | IVb | |
Area [ha] | 0.3982 ha | ||
Soil class | V | ||
Area [ha] | 2.2129 ha | ||
Soil class | VI | ||
Area [ha] | 0.3327 ha | ||
Present usage | Present usage | industrial | |
Differences in land level [m]: | flat area | ||
Building height limit [m]: | 12 m | ||
Building coverage [%]: | 60 | ||
Soil and underground water pollution: | not_interested | ||
Underground water level [m]: | 1,8-2,5 | ||
Were geological research done: | done | ||
Risk of flooding or land slide: | not_interested | ||
Underground obstacles: | not_interested | ||
Ground and overhead obstacles: | not_interested | ||
Ecological restrictions: | not_interested | ||
Buildings / other constructions on site: | not_interested | ||
Transport links
|
|||
Access road to the plot (type and width of access road) | Road type | national road | |
Road width [m] | 6 m | ||
Nearest motorway / express road / national road | S 11: 1 km | ||
Sea and river ports located up to 200 km | Świnoujście: 205 km | ||
Railway line | Szczecinek: 6 km | ||
Railway siding | Szczecinek: 6 km | ||
Nearest international airport | Szczecin/Goleniów: 160 km | ||
Nearest province capital | Szczecin: 170 km | ||
Existing infrastructure
|
|||
Electricity | done | Connection point (distance from boundary) [m] | 0 m |
Voltage [kV] | 0.4 kV | ||
Available capacity [MW] | 1 | ||
Gas | done | Connection point (distance from boundary) [m] | 0 m |
Available capacity [Nm³/h] | 1 | ||
Water for social purposes | done | Connection point (distance from boundary) [m] | 0 m |
Available capacity [m³/24h] | 100 | ||
Water | done | Connection point (distance from boundary) [m] | 0 m |
Available capacity [m³/24h] | 100 | ||
Sewage discharge | done | Connection point (distance from boundary) [m] | 0 m |
Available capacity [m³/24h] | 100 | ||
Treatment plant | not_interested | ||
Telephone | not_interested | Connection point (distance from boundary) [m] | 0 m |
Offer prepared by
|
|||
Name, surname: | Paweł | ||
Position: | Dyrektor ds. Promocji i Obsługi Inwestycji | ||
Phone: | +48 795 265 089 | ||
Mobile: | 795 265 089 | ||
e-mail: | p.pawlak@investparkszczecinek.pl | ||
Contact person
|
|||
Name, surname: | Paweł Pawlak | ||
Phone: | 795 265 089 | ||
e-mail: | p.pawlak@investparkszczecinek.pl | ||
Created by (user account type)
|
Guest |
Time since last edit: 4 months 9 days
Last modified: 2022-11-15